St Georges School, Broadstairs

St Georges School, Broadstairs

New build primary school 9 classrooms with rugby pitch. This project was a particularly challenging fast-track scheme with completion essential for early September and the new school term. Lakepoint was contracted to provide traditional strip foundations with RC slab...
Skinners Kent Primary School, Tunbridge Wells

Skinners Kent Primary School, Tunbridge Wells

This new sustainable school development hosts a 2-storey state-of the-art teaching facility and outdoor space. Baxall’s winning bid offered KCC a value engineered solution using ‘modern methods of construction’ which specifically encompassed a STREIF off-site...
Robsack Wood School, Hastings

Robsack Wood School, Hastings

A logistically challenging project, consisting of construction of a 2 storey new school building, Lakepoint was responsible for the construction of deep strip foundations with reinforced slab, External works, paving and tarmac. The site was set in the heart of an...
Tonbridge School Divinity Building

Tonbridge School Divinity Building

Chadwick Building a traditional 2 story building in a particularly challenging location as the plot sat in a completely land-locked position within this busy occupied school. Strip foundations and RC Slab Drainage and hard landscaping
Holborough Lake School, Snodland

Holborough Lake School, Snodland

Constructed as part of the Basic Needs Programme for KCC, the two storey design and build 1FE Primary School was built from piled foundations and a steel frame on greenfield site. Lakepoint was responsible for pilled foundations with RC ground beams, attention tanks...