Holborough Lake School, Snodland

Constructed as part of the Basic Needs Programme for KCC, the two storey design and build 1FE Primary School was built from piled foundations and a steel frame on greenfield site.

Lakepoint was responsible for pilled foundations with RC ground beams, attention tanks installation and all external works , including Car park, paving kerbing, mixed externals off top soil, tarmac and road lining, MUGA pitch, basketball court, playing fields with extensive

Educational

Project Value

£700,000